§ 3. Conditions.  


Latest version.
  • An advance application and permit form shall be required by the grantor before any construction work within the city street rights-of-way will be allowed to occur. Two copies, including a detailed site plan, shall be submitted to the city's director of public services for review and approval. All work within the city's street rights-of-way shall be in accordance with the city's standard construction specifications. All applicable fees are due and payable before construction work is to begin.

    Emergency operations do not need an advance permit before beginning repairs. However, a permit will still need to be obtained on the first business day following the emergency operations. All rules and requirements will still be in effect.

    No highway, street, alley, bridge, waterway or other public place used by said grantee shall be obstructed longer than necessary during the work of construction or repair, and shall be restored to the same order and condition as when said work was commenced. All of grantee's pipes and mains shall be so placed in the highways and other public places as not to unnecessarily interfere with the use thereof for highway purposes.

(Ord. No. 400, 10-24-05)